Final piece installed at 22-26 West Broadway

Date Published

9 June 2015

Time

0 min read

Share

, Facebook, Twitter

The lobby stair was completed this week at Utile and Evergreen Property Group’s 22-26 West Broadway, marking the final piece of construction. The custom-designed stair, with white oak-clad treads and risers and a structural glass guardrail, connects the ground floor lobby to a larger shared library/lounge and outdoor courtyard on the second floor. The mixed-use building opened to its first residential tenants in May 2015 and is anticipating a summer opening for the ground floor restaurant.

Related News

  • Utile represents at SNEAPA 2025!

    12/01/2025

    read more
  • Brown University's Admission Welcome Center is officially open!

    11/20/2025

    read more
  • Interconnectivity Through Symbolism this Native American Heritage Month with Ella Nathanael Alkiewicz 

    11/05/2025

    read more
  • Exciting things happening at the Grove Hall Community Center Groundbreaking!

    10/15/2025

    read more
  • Utile brings home hardware from PhiusCon!

    10/14/2025

    read more
  • Victoria Chaney elected for BosNOMA's 1st Vice President & President-Elect!

    10/08/2025

    read more